The morning started much like the others, I sized up the steel and marked the cut line.
It always amazes me to see how fast the rust starts. That is the new piece that I installed a few days ago.
One the old was cut out, I cleaned all the rust flakes from the inside.
I wanted to take the new steel past the edge because the old was all bent and nasty looking.
see
After cleaning the area, I primed the inside that no one will ever see again.
Grinded and ready for prime
I welded the backing strip inside first.
And primed the entire area when finished
I tucked a tab into the side to give a better look
The sealer is on and one more side is welded in place. Next to drill and bolt it down.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.