Tuesday, July 9, 2013

The Bathroom was next


The Bathroom stall had to go next.
The stalls, like the locker across from the bathroom , were installed after the side walls had been covered.
That will require that the stall be removed before I can remove the wood.
It is a slow process.









No comments:

Post a Comment

Note: Only a member of this blog may post a comment.